Sunday, July 25, 2010

Going to work in the bathroom

This week was mainly spent in the bathroom doing plumbing and electrical work. The sinks are now in and the plumbing connected, ready for faucets. There will be a lower vanity top between the sinks, with a little place to sit and blowdry my hair in the morning.
The bathtub is now in and has running water! Dad connected the plumbing and sewage from the existing house, so the spot for the toilet is also ready to go (there to the left of the tub - there will be a short half-wall between the toilet and tub).
Plumbing behind the sinks
The cabinet between the bathtub on the left and the shower on the right, will be for linens and such. The plumbing for the bathroom is hidden behind this cabinet, and comes down from the existing house's attic. You can see behind the cabinet is where the old window was, in the existing house, in our current bedroom.
Dad also installed the framework for what will be a pocket door from the bathroom to the bedroom. The tub is scooted over in this picture - won't actually be there against the wall, the toilet will be there.

1 comment:

I'm Ashley. said...

Wahoo!! I loved seeing the progress :) When we get back from Seattle let's have some dinner!!